VVB

Airport

Gatwick Car Valet Gatwick Airport

Contract Value: £70k
Airports
A new Car Valet facility building was constructed by the main contractor within the existing multi storey car park at the North terminal. VVB carried out a new M&E installation consisting of a new electrical supply, new LV installation and HVAC installation.

VVB were appointed by Costain to project manage the M&E requirements of the contract from design to commissioning and handover of the finished project.

Our role included:

  • Controls and Electrical Design
  • M&E Design Coordination and Integration
  • Installation and Maintenance of Temporary Site Services
  • M&E Installation
  • M&E Testing and Commissioning
  • Co-ordination with the airport system maintainers

Throughout the design and preconstruction phase VVB provided technical knowledge and experience to all elements of the M&E systems and liaised with Costain to produce a complete integrated solution.

Our scope included:

  • New electrical supply
  • LV distribution and containment
  • New lighting and small power installation
  • Fire alarm system
  • Door access and telephone installation
  • CCTV installation
  • New air conditioning installation
  • New controlled ventilation installation

Throughout the design and preconstruction phase VVB provided technical knowledge and experience to all elements of the M&E systems and liaised with Costain to produce a complete integrated solution.