VVB

Airport

Airports

Name:

Works:

Terminal 3 Pier 5 LV Distribution Replacement Works

Terminal 3 Pier 5 LV Distribution Replacement Works Client: British Airport Authority Date: 2004 Value: 1.8 Million Survey of current LV distribution sub circuits within the Pier 5 gate lounges. Systematic removal and replacement of all relevant containment and sub …

Find out more

Name:

Works:

Gatwick NTI Gatwick Airport

Contract Value: £3m Gatwick NTI (North Terminal Interchange) was a re-construction of the existing interchange station. The existing enclosed building was de-commissioned and demolished to allow for a new larger open plan structure to be constructed with passengers taken from …

Find out more

Name:

Works:

Gatwick Airport out of gauge conveyor North Terminal

Contract Value: £100K Electrical The Electrical works have comprised of the installation of the following equipment. Containment New containment consisting of galvanised steel tray and trunking was installed along the length of the new structure for LV, emergency lighting, fire …

Find out more

Name:

Works:

Gatwick Car Valet Gatwick Airport

Contract Value: £70k A new Car Valet facility building was constructed by the main contractor within the existing multi storey car park at the North terminal. VVB carried out a new M&E installation consisting of a new electrical supply, new …

Find out more

Name:

Works:

Gatwick Temporary Passenger Walkway Gatwick Airport

Contract Value: £50k A new covered temporary passenger walkway was constructed by Costain to allow a passenger route from Arrivals to the terminal while demolition and construction works were carried out to the North Terminal extension. VVB were appointed by …

Find out more